Stalled software project turnaround
Stuck for months, and the teams argue about why?
A rollout or vendor project with no result for months; the teams and the vendor blame each other; budget drains, and “change the vendor” or “buy bigger servers” decisions get made on emotion.
What I do
I stop the argument on assumptions and agree objective metrics with all sides. I measure: load, resources, bottlenecks, code quality. I agree the solution architecture and a staged plan with success criteria. As a rule I don’t change the teams — I change how they work together. Vendor proposals are evaluated on data, including hidden risks.
Format. Project: diagnosis, then support until the plan is back on track; or embedded leadership of the initiative through to the result.
- Teams + vendordispute, no signal
- Shared metrics
- Root cause
- Staged plan
- Delivery
- ~6 / ~12 mo1C MVP and production after months of standstill
- 0teams replaced
- > ½ annual revenuehidden costs a manufacturing client was protected from (estimate)
More: the proof
A 1C rollout stalled for months in a “code or servers” dispute between infrastructure, support and the vendor. After measurements — an agreed architecture and plan: a working version in ~6 months, production in ~12, without replacing teams.
A manufacturing client: a replacement of its industry software whose hidden costs would, by our estimate, have exceeded half a year’s revenue. Together with my partner I gathered the evidence, asked the vendor the uncomfortable questions and shifted implementation risk onto them — the vendor withdrew from the deal itself.